Superfund Information Systems: Site Profile

Superfund Site:

WESTLAKE LANDFILL
BRIDGETON, MO

Site Documents & Data

For assistance with 508 Accessibility, please reach out to the Site Contacts.

Sign up for this Superfund site’s mailing list

On this page:


Featured Documents

The following documents represent the most recent/relevant deliverables or EPA correspondence related to those deliverables. Additional documents are available below under the “Reports and Documents” section.

OU-1 Draft Revised Excavation Plan (REP)

Revised Excavation Plan OU01 

Revised Excavation Plan Part 1 of 5 

Revised Excavation Plan Part 2 of 5: Appendix A Technical Memorandum (TM) Estimate Of Extent Of Radiologically Impacted Material (RIM) Greater Than 52.9 Picocuries Per Gram

Revised Excavation Plan Part 3 of 5: Appendix B Revised Ordinary Kriging Model Technical Memorandum (TM)

Revised Excavation Plan Part 4 of 5: Appendix C Areas 1 And 2 Excavation Optimization and Appendix D - F

Revised Excavation Plan Part 5 of 5: Appendix G Design Drawings

Letter regarding the review of the Revised Excavation Plan and transmitting the Comment Response Correspondence

OU-1 Field Sampling Plans

Field Sampling Plan Addendum 9

Letter transmitting approval of Field Sampling Plan Addendum 9 with text modifications

Field Sampling Plan Addendum 10A

Letter transmitting approval of Field Sampling Plan Addendum 10A with modification

Field Sampling Plan (FSP) Addendum #: 10

Letter approving the revised Field Sampling Plan (FSP) Addendum #: 10 with modifications and conditions 

Field Sampling Plan (FSP) Addendum #: 11

Letter approving the revised Field Sampling Plan (FSP) Addendum #: 11 with conditions

OU-1 Draft Design Investigation Evaluation Report (DIER) Document

EPA DIER comment letter, 6/22/23

Design Investigation Evaluation Report (DIER) Part 1 of 9, 1/31/23

DIER Appendices A through G2, Part 2 of 9

DIER Appendix F Area 1 photos, Part 3 of 9

DIER Appendix F Area 2 Photos, Part 4 of 9

DIER Appendix F Buffer Zone, CDL, ISL photos, Part 5 of 9

DIER Appendices H through N, Part 6 of 9

DIER Appendix L Figures L-1 to L-8, Part 7 of 9

DIER Appendix L Figures L-9 to L-47, Part 8 of 9

DIER Attachment 2 Depth adjusted scans and gamma, Part 9 of 9

Place holder for DIER Attachments 1 and 2 - coming soon

West Lake Updates

West Lake Updates are an email newsletter style communication tool which EPA uses to send updates directly to subscribers. Copies of the most recent West Lake Updates are posted below, and historical updates can be found here. If you would like to start receiving these updates directly, please email Jessica Evans at evans.jessica@epa.gov.

West Lake Update dated October 17, 2023

West Lake Update dated April 25, 2023

West Lake Update dated March 3, 2023

West Lake Update dated January 24, 2023

West Lake Update dated October 31, 2022

Operable Unit 1

Draft OU-1 30% Remedial Design

Draft OU-1 Loading Transportation and Offsite Disposal Plan

Final OU-1 Design Investigation Work Plan

Final OU-1 Remedial Design (RD) Field Sampling Plan

Final OU-1 RD Quality Assurance Project Plan

Final OU-1 RD Data Management Plan

OU-1 RD Health and Safety and Radiation Safety Plan

FSP Addendum 1 – Additional Investigation in ISL/CD

FSP Addendum 2 – Additional Investigation Around Area 2

FSP Addendum 3 – Additional Investigation Around Area 1

FSP Addendum 4 - Additional Investigation in ISL/CD

FSP Addendum 5 – Additional Investigation for Modeling

FSP Addendum 6 - Comprehensive Step-Out Borings for RIM Delineation

FSP Addendum 7 (DRAFT) - Additional Sediment Sampling

EPA Comment Letter on Addendum 6 and Addendum 7

OU-1 ROD Amendment

Third Amendment to Administrative Settlement Agreement and Order on Consent for Remedial Design

Modified Statement of Work OU-1, 7/1/2022

Operable Unit 2

OU-2 Final Remedial Design Workplan (RDWP)

EPA's approval letter with modifications of the OU2 RDWP

ASAOC RD Amendment

OU-2 Final Landfill Gas Monitoring Plan

EPA’s Approval of the Landfill Gas Monitoring Plan

Landfill Gas Corrective Action Plan

Operable Unit 3

OU-3 RI/FS Work Plan Addendum 1

OU-3 RI/FS Work Plan Addendum 2

OU-3 RI/FS Work Plan Addendum 3

2022 Annual Report

2022 Annual Report Tables, Figures, Appendices

2022 Annual Report, EPA Comments

2021 Annual Report, Part 1 of 2

2021 Annual Report, Part 2 of 2

2020 Annual Report

OU 3- RI/FS Agreement

OU-3 RI/FS Work Plan

OU-3 RI/FS Field Sampling Plan

OU-3 RI/FS Quality Assurance Project Plan

OU-3 Technical Memorandums

Top of Page


Reports and Documents

Top of Page


Administrative Records

Top of Page


Site Data

Other Site Name:
In addition to WESTLAKE LANDFILL, this site has also been referred to as:

  • WEST LAKE LANDFILL
  • WESTLAKE SS#0714

National Priorities List Status:  Final
The National Priorities List is intended primarily to guide EPA in determining which sites warrant further investigation. Learn more about the NPL.

City and State: BRIDGETON, MO

County: ST. LOUIS

Congressional District: 02

EPA ID: MOD079900932

Top of Page